Basic LED Wall Sample Installation
Previous article: Assemble Module
Start Assemble
After carefully checking that all installations are in place, power on and test.
- Data Card A -> TB20 (LED OUT : Output interface)
- Connect AC220V For LED POWER | TB20 Controller
- Power On
- The controller has a built-in driver; the built-in video will start playing in about 5 seconds.
How to update content :
- Content can be updated via mobile app.
- Content editing and updates are performed via computer software.
Basic LED Wall Sample Installation
Previous article: Assemble Module