Basic LED Wall Sample Installation

Previous article: Assemble Module

Start Assemble

After carefully checking that all installations are in place, power on and test.

  • Data Card A -> TB20 (LED OUT : Output interface)
  • Connect AC220V For LED POWER | TB20 Controller
  • Power On
  • The controller has a built-in driver; the built-in video will start playing in about 5 seconds.

How to update content :

  • Content can be updated via mobile app.
  • Content editing and updates are performed via computer software.

Basic LED Wall Sample Installation

Previous article: Assemble Module